Skip to main content
Draft Feasibility Study Report

Revised Draft Feasibility Study Report

The REVISED Draft Water Quality and Recycled Water Supply Feasibility Study, which was released in March 2026, is posted below for people who prefer to access the document by chapter. (The Final Study and the Revised Draft are nearly identical, with the exception of the dates and some minor formatting changes.) For a quick overview of the project and feasibility study, see these frequently asked questions. 

Chapters

Chapter 1 – Table of Contents, Executive Summary and Introduction

Chapter 2 – Service Area and Wastewater Characterization

Chapter 3 – Alternatives Screening

Chapter 4 – Preferred Alternatives 

Chapter 5 – Priority Areas Characterization 

Chapter 6 – Recycled Water Opportunities and Constraints

Chapter 7 – Climate Change Resiliency Analysis 

Chapter 8 – Priority Unsewered Communities Strategies

Chapter 9 – Findings and Recommendations

Appendices

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I